SWMS & Risk holds the Safe Work Method Statement for each job, with risk ratings per task and a sign-off that must happen before work begins — so the method is agreed and the risk understood, not assumed.
Switch SWMS & Risk on from the App Store and it runs alongside Permit to Work, Tickets, Properties and Contractors on the shared toolkit: list, board and calendar views, custom fields, import/export and photo attachments.
A contractor attaches a SWMS to a job, breaking the work into tasks with hazards, controls and a risk rating each. The responsible person reviews and signs off before work starts, the SWMS stays linked to the Tickets work order, and the sign-off trail is kept for WHS audit.
Yes — the SWMS must be reviewed and signed off before any work on the job begins, so the method is agreed before a tool is lifted.
The work is broken into tasks, each with its own hazards, controls and risk rating, so the high-risk steps are clear rather than averaged across the whole job.
SWMS & Risk sets out the safe method while Permit to Work authorises the high-risk task; both link to the same Tickets job for one complete record.
Switch it on per organisation from the App Store. It works alongside the core registers (Tickets, Properties, Assets, Tenants and Contractors) with the same list, board and calendar views, custom fields and import/export.